OK – the Burj Dubai is not completed yet. That’s scheduled for September 2009, at a cost building of three Millau Viaducts. But it has already set a number of records:
- Tallest structure: over 636 m
- Building with most floors: 164
- Highest vertical concrete pumping: 601 m
It actually looks most impressive photographed from above. More photos here. There’s a short animation showing the speed of construction (which started on 2005-02-01) here.